Resurfacing
Pebble, Quartz, Paint or Tiles? Choosing a New Pool Interior in Brisbane
Pool Renovations Brisbane·Updated November 2026·6 min read
For most Brisbane concrete pools, pebble is the best-value new interior: published 2026 Queensland figures put a pebble resurface at $10,000 to $25,000, and it is hard-wearing and hides marks well. Quartz and glass bead cost more for a smoother, brighter finish, full tiles cost the most and last the longest, and paint is the cheapest but needs redoing every five to seven years.

What does each pool interior cost?
Queensland figures are published for pebble only, so the other finishes below are published NSW figures, which give a fair sense of how they compare.
Prices for a typical pool:
- Pebble resurface (Queensland): $10,000 to $25,000
- Standard pebblecrete (NSW): $8,000 to $12,000
- Quartz finish (NSW): $10,000 to $15,000
- Glass bead finish (NSW): $12,000 to $18,000
- Full tiling (NSW): $15,000 to $35,000
- Painted finish (NSW): $4,000 to $8,000, recoated every 5 to 7 years
The size of the pool, steps and benches, and the repairs the shell needs once it's empty move you up or down these ranges.
Pebble: the Queensland default
Pebble is the most common interior for concrete pools in Queensland for good reasons. It's tough, slip-resistant underfoot and good at hiding leaves, stains and small marks. The trade-off is texture: some people find it rough on feet, especially kids who spend all day in the pool. Finer pebble blends are smoother.
Quartz and glass bead: smoother and brighter
Quartz finishes feel smoother than standard pebble and come in brighter colours. Glass bead blends add sparkle and sit at the top of the aggregate range. Both are popular when the pool is a feature of a renovated home. Like pebble, they need a careful start-up period after the pool is refilled.
Full tiles: the longest-lasting option
A fully tiled interior costs the most but lasts the longest, and suits modern and character homes alike. The shell has to be sound and true first, because tiles show every bump. Tiles also need good grout and expansion joints, which a good tiler will explain in the quote.
Paint: the budget refresh
Paint is the cheapest way to refresh a sound rendered or previously painted pool, and can make sense before selling. It isn't a fix for rough or failing pebble, and the published figures put recoating at every five to seven years. Preparation and drying time decide how long a paint job lasts, and Brisbane's humidity makes rushing the drying a common cause of peeling.
Colour changes the water
The interior colour sets the colour of the water. Light finishes read as bright aqua, mid tones as blue, and dark finishes as deep blue or green and hide staining from leaves. Ask to see sample boards in daylight beside your coping and paving before you decide.
What you get for the price
The standard we ask of every pool specialist we refer you to
The pool specialist does the work, not us. Ask for each of these in your written quote and contract.
- A pool specialist with a current QBCC licence for the work, and public liability insurance (certificate on request)
- Pipework by a licensed plumber and anything electrical by a licensed electrician
- A written, itemised quote: drain-down, preparation, repairs, finish, tiles, coping and clean-up listed
- A written contract for any job over $3,300, with no more than the legal maximum deposit
- Queensland Home Warranty Scheme cover arranged on residential work over $3,300 where it applies
- Groundwater checked before the pool is drained, and the pool barrier kept compliant during the job
- Photos of the shell repairs before they are covered, and a walk-through when the pool is refilled
Photos of the repairs, and a written scope
Crack and shell repairs disappear under the new finish. You get photos of them before they're covered, plus a written scope and start-up advice for the new surface before anything starts.
Licensed, insured pool specialist, public liability certificate on request
Questions people ask
Sources
Related services
Published 17 November 2026.